About the department:
Head of the department: Prof. Yaseen Ali Salih Al-Qaisy.


Former heads of the department:

  • Inst. Mohammed Omer Salih,
  • Ph.D. Inst. Abdulrahman Iyadah Ibraheem,
  • Prof. Jawdat Kadhim Abbas Al-Tai'e,
  • Assist. Prof. Farouq Majeed Mhawis,
  • Assist. Prof. Adnan Jayid Zeidan,
  • Inst. Amir Hameed Mohammed,
  • Assist. Prof. Zeyad Suleiman Mohammed,
  • Inst. Faiz Abdullateef Jaleel.


Goals: The main goals of the projects and construction department is to arrange, supervise and evaluate the projects and doings that are executed by the contracting companies with the university to accomplish these projects according to an investment plan. It adheres to a vision which prioritizes work quality to attain the best engineering qualifications to keep up with the latest developments in work sector . It also aims to attain government funding to increase the university construction through coordinating with the sections and departments that are related to this department in Tikrit university.
The department of projects and construction seeks to implement a lot of important and strategic projects as soon as it accomplishes the required official approval and procedures. Some of these projects are:
1. Tikrit University medical city.
2. An integral investment complex for the university staff members which includes 500 residential units.
3. A complex for the College of education for Women within the campus.
4. A complex for the College of Education for pure sciences.
5. A complex for the college of Nursing.
6. Special dormitories complex.
7. Tikrit University Hotel.
8. Big conferences hall.
9. Tikrit University unified garage.


The project of Tikrit University library and restaurant:
The project of building Tikrit University library and hotel is still under process according to the following details:
1. Pitching the wooden template of the 1st floor columns with concrete.
2. Pitching the wooden template with concrete for the 1st floor ceiling and bridges.
3. Pitching the wooden template with concrete for the stairs.
4. Laying electrical installations pipes.
5. Laying the Ground floor sanitary pipes.
6. The Ground floor molding process.

The College of Arts Deanship project:
The project of The College of Arts Deanship / Tikrit University is still under process according to the following details:
1. Pitching the hard glass curtain wall.
2. Ceramic fixation on kitchen and sanitary complex.
3. Floor alabaster fixation.
4. Pitching made-air ducts.
5. Pitching air-conditioning units VRV.
6. Pitching circuit breakers and boards as well as electrical installations.

The College of Computing Deanship project:
Work in the College of Computing and Mathematics Deanship project is still under process and according to the following details:
1. Fixing external wall panel Alucobond.
2. Internal building wall whitening.
3. Hard glass pitching, curtain wall.
4. Floor alabaster fixation.
5. Pitching air-conditioning units VRV.
6. Electric installations.
7. Septic tank construction.


The project of typical halls for the College of Medicine:
With God's aid that the project of constructing typical halls for the College of Medicine is being resumed now. It has been suspended since 2014 due to the military operations against ISIS terrorist attacks. Work has started after preparing and cleaning the work site from the rubble and extinction factors:
1. Supplying the typical halls with central air conditioning.
2. Connecting made-air special for air conditioning.
3. Starting works of precast concrete flags for surfaces restoration.
4. Drainage bond digging.

The project of the University's library and restaurant construction:
Work is continuous in this project. Molding the ground floor ceiling and the ceiling bridges as explained in the figures below.


Constructing the College of Arts Deanship:
Work is continual to construct the College of Arts' Deanship of Tikrit University according to the following details:
1. Covering the building with hard glass services(Curtain wall)
2. Fixing windows' frames and glass services (Double glass)
3. Floor alabaster fixation.
4. Interior ceiling services.
5. Finishing building's stairs whitening.
6. Cable tray installing
7. Finishing skylight pitching.